Using the Simulated Annealing to Solve a JIT Scheduling Problem in the Two-Machine Flow Shop

Message:
Abstract:
A two-machine permutation flow shop scheduling with n independent jobs and different due dates is considered in this paper. Since this problem is shown to be NP-Hard, We use the simulated annealing to solve this problem. The objective is minimizing the weighted earliness and tardiness that cover JIT concept. We construct our algorithm in four scenarios with considering two Markov chains and two temperature reduction rates. The best scenario is proposed based on the results of computational experiments. A mathematical programming formulation is proposed for the problem, and the solution obtained by proposed SA algorithms are compared with the optimal ones obtained by mathematical model using LINGO software for small size instances. Also the performance of the best scenario is compared by the standard model of genetic algorithm for different sizes problems and its advantages are shown.
Language:
Persian
Published:
International Journal of Industrial Engineering & Production Management, Volume:23 Issue: 3, 2012
Pages:
265 to 281
magiran.com/p1063605  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!