Feasibility Study of Using from the Energy Recovery of Energy Losses in Parand Power Plant

Message:
Abstract:
This research is a model of CHP system which used energy for Parand City, produced by Gas Turbine from Parand power plant. At first, the structures are simulated base on the type of materials and the usage of structures by data gathering & simulation software such as HAP, Carrier & E-Quest software. Subsequently the Thermal Energy consumption for the City is estimated. And optimization point for production of energy is found.Retrievable energy potential from Power Plant Gas Turbines is obtained by Thermo-flow software. Then with respect to the retrievable energy potential & average demand of Thermal energy usage of City, the steam produced capacity from simulation of HRSG by Thermo-flex is calculated. Finally, the project is economically evaluated by excel software.
Language:
Persian
Published:
Quarterly Energy Economics Review, Volume:9 Issue: 39, 2014
Page:
171
magiran.com/p1302607  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!