Analysis of the Causes of Contractor's Claims in the DB Contracts of Underground Project in Iran

Message:
Abstract:
There are some possibility of claims` occurrence by both contract’s sides especially contractors in most of project that this claims negatively affect project implementation and can be prevented by cognition of main Causes of claims` occurrence. In this regard authors gather 250 reasons related to claim in underground design-Build projects. After the analyzing of these reasons closed questionaries'' include of frequency and intensity of impact in three level (first level consist of 5 group، second level consist of 16 group and third one 43 group) were produced and distributed through its perpetrators، include of The employer and contribution to the design and construction who are active in different kinds of underground projects. Then according to the result of this questionaries'' the most important Causes of claims were determined.
Language:
Persian
Published:
Tunneling&Underground Space Engineering, Volume:3 Issue: 1, 2015
Pages:
19 to 35
magiran.com/p1355107  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!