Mutual Effects of Owner-caused and Contractor-caused Delays on the Performance of International Construction Contract [Concurrent Delays]
Author(s):
Abstract:
In construction contracts، one of the analytical dimensions focuses on concurrent delays. The determination of each party''s responsibility and the mutual effects of this type of delay can be regarded as among the complicated and widely-used concepts of construction contracts; the case in which both the owner''s and the contractor''s delays independently cause delay in the critical path is different from the case in which the combined effects of both cause delays in the completion، and one cannot ignore the effects of one on the other. For this type of delay، it is not easy to determine the contribution of each factor، and it is necessary to analyze different factors influencing the delays، though some analysts believe this is impossible. In order to have a proper analysis of the effects of such delays، it is necessary to obtain the drawings، maps، data، the plant schedules، delay periods of each independent cause، and a distinct notion of critical delays as contrasted with non-critical delays. The present study tries to analyze the concurrent delays by examining the legal rules and relevant judicial procedures، and some critical and standards for determining their effects and to find out each party''s responsibility. In addition، it shows the existing challenges and relevant complexities in the way of determining the liabilities of each party.
Keywords:
Language:
Persian
Published:
Comparative Law Researches, Volume:19 Issue: 2, 2015
Pages:
1 to 23
magiran.com/p1456878
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!