The Final Surface Imperfections that Apply to the Tunnel Lining Loads Due to Explosion

Message:
Abstract:
The entrance of defensive underground structures is vulnerable to blast loading. Deliberate use of prominence in the final lining of the tunnel, one of the ways of dealing with the effects of the blast wave and reduce the vulnerability to degradation. In this study, the software (AUTODYN) the explosions in the line with the distance from the mouth of the tunnel simulated and then the effects of deliberate prominence at the end of the tunnel cover Performed directly.The amount of airflow (overpressure) discussed and finally considering the size prominence of the tunnel and reducing the amount of pressure are expressed. The results show that using prominence can Reduce overpressure inside the tunnel For acceptable.
Language:
Persian
Published:
Passive Defense Quarterly, Volume:6 Issue: 4, 2016
Pages:
33 to 41
magiran.com/p1498822  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!