Assigning limited resources to contractors with FAHP and TOPSIS methods

Abstract:
This paper propose a solution method for assigning limited liquidity to contractors based on the project priorities which is one of the current issues in project liquidity management. The aim of this research is to introduce an approach to resolve the problems of public contractors in assigning resources to oil and gas projects. In this paper, first the effecting indices on contractor's performance are determined by Fuzzy AHP method. Then, the importance weights of the related criteria are calculated and the final scores of the contractors are found by TOPSIS technique based on the indices. Afterwards, the contractors are ranked. At the end, the method of assigning limited liquidity to the contractors is introduced using a heuristic algorithm. The actual data of a public contractor in oil and gas industry are used to illustrate the proposed procedure. Finally, the results and suggestions for further improvement are shown.
Language:
Persian
Published:
IRANIAN JOURNAL OF TRADE STUDIES (IJTS), Volume:21 Issue: 82, 2017
Pages:
177 to 202
magiran.com/p1707457  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!