Resource Constrained Project Scheduling with Stochastic Resources

Article Type:
Research/Original Article (بدون رتبه معتبر)
Abstract:
Despite the dynamic nature of real life scheduling problems, few studies focus on stochastic resource constrained project scheduling problem and its variants. In this study, we consider stochastic resource possibilities and propose a new chance constraint, piecewise-linear and mixed integer programming model. Model is tested and verified with known project instances. One of the main strengths of the proposed model is it can be used to construct baseline schedules with a predetermined confidence interval. This gives scheduler an opportunity to construct proactive actions in order to minimize disruptions.
Language:
English
Published:
Journal of Applied Research on Industrial Engineering, Volume:5 Issue: 1, Spring 2018
Pages:
39 to 49
magiran.com/p1846812  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!