Minimizing Total Resource Tardiness Penalty Costs in the Resource Constrained Project Scheduling Problem with Metaheuristic Algorithms

Message:
Article Type:
Research/Original Article (بدون رتبه معتبر)
Abstract:
In this paper, we study a resource-constrained project-scheduling problem in which the objective is minimizing total Resource Tardiness Penalty Costs. We assume renewable resources that are limited in number, are restricted to very expensive equipment and machines, therefore they are rented and used in other projects, and are not available in all project periods. In other words, there exists a predefined ready-date as well as a due date for each renewable resource type. In this way, no resource is utilized before its ready date. Nevertheless, resources are allowed to be used after their due date by paying penalty costs depending on the resource type. The objective is to minimize the costs of renewable resource usages. We formulated and mathematically modeled this problem as an integer-Linear programming model. Since our problem is NP-hard and also exact methods are only applicable in small scale, therefore metaheuristic methods are practical approaches for this problem; this means that metaheuristics are better for this problem. In order to authenticate the model and solution algorithm in small scale, we consider a network with low activity, and then solve the model of this network with both exact algorithms and SA-GA-TS metaheuristic algorithms. For more activities, as well as getting closer to the real world, we present a Simulated Annealing Algorithm to solve this problem. In order to examine the performance of this algorithm, data that had been derived from studied literature were used, and their answers were compared with Genetic Algorithm (GA) and Tabu Search Algorithm (TS). Results show that in average, quality of SA answers was better than those of the GA and TS algorithms. In addition, we use relaxation method to achieve an even higher validation for the SA algorithm. Finally all results in this paper indicate that both model and solution algorithm have high validity.
Language:
English
Published:
International Journal of Research in Industrial Engineering, Volume:2 Issue: 3, Summer 2013
Pages:
47 to 57
magiran.com/p2079058  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!