The heuristic and metahuristic methods to minimize the total completion and total tardiness jobs times problem

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

In this paper, we found some methods for solving one of the bicriteria machine scheduling problems (BMSP). Our discussed problem is represented by the total completion and the total tardiness jobs times (1//(∑Cj,∑Tj)) simultaneously. In order to solve the suggested BMSP, some new heuristic and metaheuristic methods are proposed which are produced good results. The results of the new suggested methods are compared with the exact method; like the complete enumeration method (CEM) and Branch and Bound (BAB) method, then compared results of the heuristics with each other's to obtain to the most efficient method.

Language:
English
Published:
International Journal Of Nonlinear Analysis And Applications, Volume:13 Issue: 2, Summer-Autumn 2022
Pages:
2025 to 2035
magiran.com/p2465459  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!