Equipping Civil Plans of Country
Considering the importance of workshop equipment in massive civilian operations, it should be acknowledged that the equipment of a construction workshop is not comparable to that of other workshops. Hence, a number of points are noted in this regard as follows: - Estimation of workshop equipment costs should be carried out by the consultant engineering firm in proportion to the total project. Consultant will make the necessary predictions in specifications or price list on how to pay for workshop equipment costs in accordance with relevant instructions and considering the schedule of the implementation of workshop equipment. The percentage of the cost of workshop equipment is not constant and varies according to the type of the project and its characteristics, as well as topographic and climatic conditions of the plan’s site. - The purpose of equipping and dismantling workshops is to supply buildings, facilities, equipment and machinery through constructing, installing or controlling them based on facilities on site and in the form of purchase or leasing of services.
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.