A Project Scheduling Method Based on Fuzzy Theory

Author(s):
Message:
Abstract:
In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modified backward pass (MBP). This approach, based on a linear programming (LP) problem, removes negative and infeasible solutions which can be generated by other methods in the backward pass calculation. We drive the general form of the optimal solution of the LP problem which enables practitioners to obtain the optimal solution by a simple recursive relation without solving any LP problem. Through a numerical example, calculation steps in this method and the results are illustrated.
Language:
English
Published:
Journal of Industrial and Systems Engineering, Volume:1 Issue: 1, Spring 2007
Page:
70
magiran.com/p650861  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!