Monitoring of Tabarak-Abad Dam during Construction Using Back Analysis (Technical Note)

Message:
Abstract:
Tabarak-Abad dam is a clay core, earth-rock fill dam with the height of 74 m above its rocky foundation. The dam with the crest length of 193.5 m is located on the Tabarak-Abad River at north east of IRAN. Construction of the dam began on January 2003 and completed on October 2004. The dam is extensively instrumented to provide data required for monitoring. The paper will describe the instrumentation system installed in the dam body with back analyses and monitoring the water pressure, earth pressure and deformation.
Language:
Persian
Published:
Civil Engineering Infrastructures Journal, Volume:44 Issue: 3, 2010
Page:
407
magiran.com/p797248  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!