DELIVERY IN CONTRACTS OF CONSTRUCTION CONTRACTING: A COMPARATIVE STUDY IN FRENCH AND BRITISH LAW
Author(s):
Abstract:
Complete and non-defecting delivery of construction is one of the important obligations of construction contracts. However, unlike in most of the consuming products, the troubleshooting of construction needs passages of time, since hidden defects appear through time and usages of consumer. Although after the delivery of construction the claim of consumer is not admissible, in hidden defects it is accepted. On the other hand, assessment of the quality of used instruments in construction needs passage of time in order to have a precise judgment. Therefore, two kinds of guarantee is considered in delivery; a guarantee in which a consumer can request removal of defects (temporary guarantee) and a guarantee which is applicable after the determined delivery and completion of first satisfaction guarantee period. The present article while examining the nature, kinds and effects of delivery, is looking for the abovementioned instances.
Language:
Persian
Published:
journal of Private law studies, Volume:41 Issue: 3, 2012
Page:
117
magiran.com/p973966
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!