به جمع مشترکان مگیران بپیوندید!

تنها با پرداخت 70 هزارتومان حق اشتراک سالانه به متن مقالات دسترسی داشته باشید و 100 مقاله را بدون هزینه دیگری دریافت کنید.

برای پرداخت حق اشتراک اگر عضو هستید وارد شوید در غیر این صورت حساب کاربری جدید ایجاد کنید

عضویت

فهرست مطالب md. limonur lingkon

  • Md. Limonur Lingkon *, Pronab Saha, Abdulla Al Manzid, Md. Hasan, Showra Mahalanobish
    The purpose of this study is to determine how the Bangladeshi garment industry's sewing defect reduction and productivity enhancement are affected by the Plan, Do, Check, Act (PDCA) and 5S (Sort, Set in order, Shine, Standardize, Sustain) techniques. One of the main reasons for production delays and increased costs is sewing defects. By reducing defects, improving  Overall Equipment Effectiveness (OEE), and methodically using integrated PDCA concepts, the study aims to streamline and expand the production flowline while increasing throughput. To continuously evaluate and improve the sewing process, the 5S method is also employed. Tools like cause-effect diagrams and Pareto charts were used to identify the defect correctly. The OEE was used to evaluate the actual efficiency. The integration of 5S and PDCA as a lean methodology was utilized to minimize the defect rate and maximize quality to improve efficiency. For this purpose, data was collected from some renowned factories in Bangladesh. This mixed-integrated methodology is used in the study to integrate quantitative defect analysis with worker satisfaction along with efficiency surveys. The findings should offer valuable insights to the RMG industry in Bangladesh, as producers seek sustainable methods to increase productivity and enhance product quality while mitigating the impact of sewing errors on their production procedures. OEE was increased by almost 3-4% through this research.
    Keywords: Sewing, Productivity, PDCA, Lean, Efficiency, Simulation}
  • Nagib Sarfaraj *, Md. Limonur Lingkon, Nusrath Zahan
    The continuous growth of the population causes an increased demand for our healthcare services. Insufficient hospitals face challenges to serve the patient within a preferable duration. Long lines in front of counters increase the processing time of a patient. From the entry to the completion, plenty of time waste just for unscheduled hospital management system. Job shop scheduling is an optimization process in which jobs are assigned with maintain a particular sequence. In this paper, we proposed flexible job shop scheduling to solve this type of problem by considering patients as job and test counter as machine for the optimization of the processing time and increase the efficiency of a hospital or a clinic. Genetic Algorithm was used to analyze the processing time for multiple counter of a hospital for a stable and effective scheduling. The results showed that an optimized make-span was generated and patients could fulfill their needs much quickly after applying flexible job shop scheduling.
    Keywords: scheduling, make-span, generic algorithm}
بدانید!
  • در این صفحه نام مورد نظر در اسامی نویسندگان مقالات جستجو می‌شود. ممکن است نتایج شامل مطالب نویسندگان هم نام و حتی در رشته‌های مختلف باشد.
  • همه مقالات ترجمه فارسی یا انگلیسی ندارند پس ممکن است مقالاتی باشند که نام نویسنده مورد نظر شما به صورت معادل فارسی یا انگلیسی آن درج شده باشد. در صفحه جستجوی پیشرفته می‌توانید همزمان نام فارسی و انگلیسی نویسنده را درج نمایید.
  • در صورتی که می‌خواهید جستجو را با شرایط متفاوت تکرار کنید به صفحه جستجوی پیشرفته مطالب نشریات مراجعه کنید.
درخواست پشتیبانی - گزارش اشکال