P R O J E C T R I S K A S S E S S M E N T B Y A H Y B R I D A P P R O A C H U S I N G F U Z Z Y-A N P A N D F U Z Z Y-T O P S I S

Abstract:
Usually, projects are implemented in dynamic and complex environments due to their inherent uncertainties and risks. The purpose of risk management is to improve project performance via systematic risk assessment and response. Companies have limited resources for managing all project risks; therefore, they need to prioritize the important ones. In particular, resources should be allocated to managing risks with higher priorities. In classical approaches, probability and impact are two commonly used criteria in project risk assessment; however, these criteria do not suciently address all its aspects. Moreover, there may be interrelations and dependencies among the various criteria.In order to overcome these drawbacks, we proposed a practical framework for evaluating risk in projects. The proposed framework has three main steps. First, we identify project risks and determine those of importance to be evaluated by multiple attribute decision-making (MADM) techniques. Then, we use a fuzzy analytic network process (fuzzy-ANP) for calculating criteria weights. The model is capable of considering dependencies among the di erent criteria. Also, the model calculates consistency indices for the fuzzy pair-wise comparison matrices. Finally, the outputs of fuzzy-ANP calculations are used in a fuzzy-based technique for \order preference by similarity to ideal solution" (fuzzy TOPSIS) for ranking risks based on their importance.A case study of an Iranian power plant project is presented to demonstrate the applicability and performance of the proposed model. By di erent mechanisms, more than 100 risks were identi ed and categorized according to their sources. Next, we determine 10 important risks as alternatives for the fuzzy-ANP and fuzzy-TOPSIS procedures. We conclude that inadequate sta skill is the most important risk in such projects. Among other risks, diculties in project nancing are very important.In order to verify the obtained results and justify the proposed method, we calculated weights of the criteria (and sub-criteria) and ranked the risks using 6 di erent methods. We use the extent fuzzy-AHP and fuzzy prioritization approach for calculating the weights of criteria (and sub-criteria). According to obtained results, signi cant di erences are observed in the weights of subcriteria when dependencies are considered. In addition, there are no signi cant di erences between rankings of risks for di erent methods. The results show that the proposed method is a suitable approach when performance ratings and weights are vague and imprecise.
Language:
Persian
Published:
Industrial Engineering & Management Sharif, Volume:29 Issue: 2, 2014
Pages:
3 to 14
magiran.com/p1253360  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!