The Presentation of Environmental Risk Assessment Pattern for Gas Pipeline Project by Using of Indexing System and AHP Methods (Case Study: Transportation Pipelines 24 inches, Tasuj-Salmas Project)

Message:
Abstract:
Gas transportation pipelines production plans, unlike technical and economical justification in the field of energy supplying for societies, by having danger on environment, needs the continuous studies of assessment and environmental risk management in manufacturing and benefiting stage. In this study, for purpose of environmental risk assessment for gas transportation pipelines the indexing system method and Analytical Hierarchy Process were combined. Indexing System is a compulsive and applicable method that was based at the basis of characterizing index effect and ranking. By using this method, we can classify, quantify and prefering types of environmental risk in pipelines according to the determined criteria’s and typical. In the mentioned method, typical of dangers, show the possibility of danger occurrence and effects of typical show the effect intensity. Final grade for environmental risk in this method produce via possibility of danger occurrence multiply with effect intensity. According to that efficiency scale for whole of criteria are not equal in the final level of risk. In addition for the purpose of weighting the criteria’s, the Analytical Hierarchy Process was used and for the purpose of weighting the digital layers of information related to the criteria Ordered Weight Analysis method was used. For the purpose of examination results of this research, environmental risk assessment of gas transportation pipelines 24 inches for Tasuj-Salmas with approximate length about42 kilometer as a case study was exerted. Via usage of Geographic Information Systems abilities, the identified risks and risk zonation in the path of pipelines were considered. Results showed that 46% of gas pipeline path of Tasuj-Salmas, has a high risk level (5467- 6054 grade), 48% of it, has a medium risk level (6055- 6641 grade), 2% of it, has a low level of risk (6642-7228 grade) and 4% of it, has a little risk (7228< grade). Adjacency of southern zone of pipelines path with Orumieh lake national park, is an important ecological sensitivity that is under investigation. 15 kilometer of pipeline path (kilometer 18+220 to 33+220) is aligned with 5 kilometer of biosphere reserved.
Language:
Persian
Published:
Journal of Environmental Sciences and Technology, Volume:16 Issue: 3, 2014
Pages:
11 to 23
magiran.com/p1351131  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!