P R O D U C T I O N P L A N N I N G M O D E L F O R C L O S E D-L O O P S U P P L Y C H A I N W I T H U N C E R T A I N T Y A N D I N V E N T O R Y A N A L Y S I S
Author(s):
Abstract:
Green supply chain management (GSCM) has been growing in recent years with interest from both academia and industry. A preponderance of special issues devoted to this topic in leading operations and supply chain management (SCM) journals attests to this trend. The closed loop supply chain (CLSC) is a branch of GSCM which includes recycling and remanufacturing activities for reasons of environment protection. CLSC has attracted growing attention in recent years, due to the scarcity of natural resources and increased environmental concerns. In this paper, a multi period model is proposed which contains production planning and inventory control in a closed loop system. This model is developed from the work of Shi et al. (2011), which considers return flow and uncertainty for production planning in a closed loop system. In the proposed model, we have added inventory control, pricing, land filling, recycling and out sourcing (manufacturing, remanufacturing and return) to the former model. Since this model considers inventory control, it should be a multi period model. For decreasing the complexity of the model, in this paper, it is assumed that only one product can be produced. But, it can be used for multi products too. It is assumed that a percentage of used products can be remanufactured but all can be recycled. The genetic algorithm (GA) is suggested for solving the proposed model. Some random examples are solved by GA for illustrating the proposed model and the solving approach. For evaluating the solving approach, one of the model's constraints is eliminated and the example solved without that constraint. Hence, the upper limit of the objective function is defined. The results show that the solving approach has a maximum average error of 3.59 percent. Note that the upper limit of the objective function is infeasible for the original example. Hence, GA is an appropriate approach for solving the proposed model.
Keywords:
Language:
Persian
Published:
Industrial Engineering & Management Sharif, Volume:30 Issue: 1, 2014
Pages:
41 to 50
magiran.com/p1359091
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!