Forecasting project duration by Earned Duration Management and Risk Management

Abstract:
Being observed frequently that projects cannot achieve to their plan duration and their budget. Utilizing retrospective method is one of the reasons for this problem. In this research two method, Earned Duration Management and risk management, has been used to remove the gap of the plan and the reality; this enable the project to utilize both high accuracy of the first method and prophecy of the second tool. First, control limits were made by Monte Carlo simulation; then, the risks were recognized, after that, project was simulated under the condition that assumed critical risk has happened. At the end, if the simulated indexes violate the limits it will be a signal that program should be revised. The final estimated duration is about two month more than the row plan, that it shows the necessity of taking accounts of risks during planning.
Language:
Persian
Published:
Journal of Industrial Management, Volume:8 Issue: 21, 2016
Pages:
217 to 240
magiran.com/p1657988  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!