D E V E L O P I N G A M O D E L-B A S E D D S S F O R I N T E G R A T I N G P R O J E C T P E R F O R M A N C E E V A L U A T I O N A N D R I S K M A N A G E M E N T (C O N S T R U C T I O N I N V E S T M E N T P R O J E C T
Author(s):
Abstract:
Today, the construction industry is complex and ambiguous, and the active agents are forced to use the new tools of project management and knowledge of the world to focus on key areas which will enhance them inevitably and thus success is guaranteed. One of the main areas to focus on is the context of project management issue, in this way the performance management is optimized and operational performance is improved to support the risk management and reach the strategies of the organization. With the science development, the optimization of possibility of projects and implementation process, is a critical step in the process of completing the project.According to studies, about 60% of the failure of construction companies, has been due to financial matters. According to the literature, to meet the demands, deficiencies in risk management and financial management of the project were discussed to evaluate the performance. In this research, the evaluation of project performance and risk management is integrated and evaluated. Therefore, a comprehensive model for integrated performance evaluation models and risk analyses, using a model-based decision support system, was considered that aims to increase accuracy, convenience, efficiency and effectiveness in both the planning and implementation of project. A decision support system (DSS) is a model-based or knowledge-based system intended to support managerial decision making in semi-structured or unstructured situations.The proposed model for project performance targets, contain: time, cost and finance. The model fits with the discussed projects to integrate performance evaluation with risk analysis, by developing earned value management approach with financial measures. Integration with Kalman filter prediction method is proposed. And thus the model can be used in the project, for progress tracking, risk analysis, and predictions for the future of performance targets. Acomprehensive model presented for an actual project implementation is describedand its results will be compared with the standard methods of project managment.
Keywords:
Language:
Persian
Published:
Industrial Engineering & Management Sharif, Volume:33 Issue: 1, 2017
Pages:
129 to 139
magiran.com/p1754521
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 990,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 50 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!