Analytic comparison between executed and predicted watershed management practices in Mokhtaran watershed, Southern Khorasan

Article Type:
Research/Original Article (ترویجی)
Abstract:
Today, the assessment of water management projects is one of the most fundamental issues that are being addressed in countries in order to implement future plans and manage natural resources. In this study, in order to evaluate the watershed management operation, the executed and predicted watershed management operations in Mokhtaran watershed were compared according to the year and type of implementation. According to the foreseen activities for all sub-basins, during the years 2007 to 2011, the biological operations were only implemented for the sub-basins M21 and M22 regardless of their prioritization. Furthermore, during the years 2007 to 2011, mechanical operations were only executed in the sub-basins M21, M22 and M41 which were in conflict with the type of previously foreseen structures for the sub-basins. Results showed that in the comprehensive studies there is not a special attention to the socio-economic considerations of available constraints within the studied basin. The shortage of developmental budgets has also been another main factor behind the lack of agreement between implemented and anticipated watershed management operations. During the last 6 years, the amount of developmental budgets has been closed to zero. The low population density of the Mokhtaran basin was another reason for not implementing the planned watershed management activities. Therefore, in order to reduce the inconsistency and difference between the projected and implemented activities in the watershed, the following measures should be considered: 1- Given that it is not possible to accomplish tasks due to shortages of manpower and resources at the same time in all sub-basins, the prioritization of sub-basins should be specified in the early stages. 2- In order to prioritize sub-watersheds, the use of precise and mathematical prioritization methods such as fuzzy-topsis is recommended. 3- The need for a comprehensive approach for prioritizing and selecting the type of watershed operation is indispensable to reduce the degree of contradiction between the activities planned and the implementation of the activities. 4- Due to the lack of development budgets and low population density in the area, comprehensive management of watersheds should include the study and recognition of all technical, economic and social aspects of the area in order to prevent the waste of watershed resources and achieve the watershed management objectives.
Language:
Persian
Published:
Journal of Extension and Development of Watershed Managment, Volume:6 Issue: 21, 2018
Page:
1
magiran.com/p1838188  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!