R E P R E S E N T I N G A M U L T I- A T T R I B U T E F U Z Z Y A H P A N D F U Z Z Y D E M A T E L A P P R O A C H I N O R D E R T O R A N K R I S K E F F E C T I V E F A C T O R S I N P O W E R H O U S E P R O J E C T S
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Anxiety for incorrect risks management is the most important obstacle to the development of investment projects. Risk management is the most important part of project management in organizations discussed below, and there is not systematic structural approach to the risk assessment in this study, we use a combination model of Fuzzy Analytic Hierarchy Process (FAHP) and Fuzzy Decision-making Trial and Evaluation Laboratory(FDEMATEL) method to rank and valuate risk factors in Power Plant Projects. Firstly, the risk factors of construction projects are figured out through literature review and expert interview in the second step, the main criteria and sub-criteria are weighted using fuzzy hierarchical analysis is in the third stage, interrelationships among risk factors are calculated by fuzzy DEMATEL. The results of the research identifying causal factors can determine the main risk factors in the powerhouse projects. The populations of the investigation are managers and experts in the field of research. Eleven experts being familiar with construction project management are selected using judgmental sampling. In this study, for the investigation of the distribution of the type of data, Kolmogorov- smirnov test has been used. The prioritization of these factors show that among the main criteria for research, implementation and construction achieved the highest rank, and other factors are important in the next position. Also, among the 53 sub-criteria research, increasing construction costs, the lack of skilled labor, confiscation of property, and land ownership hold the highest priority and are of utmost importance in the standpoint of respondents. The implementation and construction of risk have the first rank., Also, have the highest weight and have the highest interaction with other criteria by DEMATEL in terms of innovation, in most of the topics of risk management this weakness in the present article has been solved.
Keywords:
Language:
Persian
Published:
Industrial Engineering & Management Sharif, Volume:33 Issue: 2, 2018
Pages:
63 to 74
magiran.com/p1843882
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!