Bi-objective scheduling for the re-entrant hybrid flow shop with learning effect and setup times

Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
The production scheduling problem in hybrid flow shops is a complex combinatorial optimization problem observed in many real-world applications. The standard hybrid flow shop problem involves often unrealistic assumptions. In order to address the realistic assumptions, four additional traits were added to the proposed problem. These include re-entrant line, setup times, position-dependent learning effects, and the consideration of maximum completion time together with total tardiness as objective function. Since the proposed problem is non-deterministic polynomial-time (NP)-hard, a meta-heuristic algorithm is proposed as the solution procedure. The solution procedure is categorized as an a priori approach. To show the efficiency and effectiveness of the proposed algorithm, computational experiments were done on various test problems. Computational results show that the proposed algorithm can obtain an effective and appropriate solution quality for our investigated problem
Language:
English
Published:
Pages:
2233 to 2253
magiran.com/p1866623  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!