Modeling and optimizing a multi-objective flow shop scheduling problem to minimize energy consumption, completion time and tardiness
Message:
Abstract:
Energy consumption considerations in production systems have recently attracted the attention of researchers. In conventional production scheduling models the importance has more often been given to time-related rather than to energy-related performance measures. In this paper we simultaneously consider energy consumption, completion time and tardiness in the presented Multi-Objective Mixed Integer Programming flow shop scheduling model. After validating the model by solving small-scale numerical examples with Weighted Sum and Epsilon-constraint method in GAMS, the large and medium-scale examples are solved via NSGA-II and SPEA-II metaheuristic-algorithms. The results proves the efficiency of the proposed algorithms.
Language:
Persian
Published:
Journal of Decisions and Operations Research, Volume:3 Issue: 3, 2018
Pages:
204 - 222
magiran.com/p1928397  
برخی از خدمات از جمله دانلود متن مقالات تنها به مشترکان مگیران ارایه می‌گردد. شما می‌توانید به یکی از روش‌های زیر مشترک شوید:
اشتراک شخصی
در سایت عضو شوید و هزینه اشتراک یک‌ساله سایت به مبلغ 300,000ريال را پرداخت کنید. همزمان با برقراری دوره اشتراک بسته دانلود 100 مطلب نیز برای شما فعال خواهد شد!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی همه کاربران به متن مطالب خریداری نمایند!
توجه!
  • دسترسی به متن مقالات این پایگاه در قالب ارایه خدمات کتابخانه دیجیتال و با دریافت حق عضویت صورت می‌گیرد و مگیران بهایی برای هر مقاله تعیین نکرده و وجهی بابت آن دریافت نمی‌کند.
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.