Modeling and optimizing a multi-objective flow shop scheduling problem to minimize energy consumption, completion time and tardiness

Message:
Abstract:
Energy consumption considerations in production systems have recently attracted the attention of researchers. In conventional production scheduling models the importance has more often been given to time-related rather than to energy-related performance measures. In this paper we simultaneously consider energy consumption, completion time and tardiness in the presented Multi-Objective Mixed Integer Programming flow shop scheduling model. After validating the model by solving small-scale numerical examples with Weighted Sum and Epsilon-constraint method in GAMS, the large and medium-scale examples are solved via NSGA-II and SPEA-II metaheuristic-algorithms. The results proves the efficiency of the proposed algorithms.
Language:
Persian
Published:
Journal of Decisions and Operations Research, Volume:3 Issue: 3, 2018
Pages:
204 to 222
magiran.com/p1928397  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!