Prioritization of Sub-Catchments for Operation of Watershed Management Projects Via Multi-Criteria Decision Making Techniques (Case Study: Asyabjofeth Watershed)

Author(s):
Message:
Abstract:
Few researches about prioritization of sub-watersheds of watersheds were conducted to watershed management operations in the world. Cause of existing of professional intervention in traditional method of watershed management office, this research was carried out to prioritization of sub-watersheds via multi-criteria decision making techniques (TOPSIS and VIKOR method in 12 different weighting conditions) in Asyabjofeth watershed. Problems was divided to 5 criteria as soil erosion and deposition, drought, flood, aridity, socio-economic problem. According to results, first scenario (equal weight of sub criteria) of TOPSIS and VIKOR methods and traditional method conducted same in recognition of two most and least critical sub catchments and differed together in recognition of sub watersheds with moderate critical.
Language:
Persian
Published:
Journal of Watershed Management Research, Volume:9 Issue: 18, 2019
Pages:
36 to 46
magiran.com/p1928784  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!