Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fixed interval preventive maintenance (PM) and budget constraint are considered.PM activity is a crucial task to reduce the production efficiency. In the current research we focused on a scheduling problem which a job is processed at the upstream stage and all the downstream machines get busy or alternatively PM cost is significant, consequently the job waits inside the buffers and increases the associated holding cost. This paper proposes a new more realistic mathematical model which considers both the PM and holding cost of jobs inside the buffers in the stochastic flexible flow shop scheduling problem. The holding cost is controlled in the model via the budget constraint. In order to solve the proposedmodel, three hybrid metaheuristic algorithms are introduced. They include a couple of well-known metaheuristic algorithms which have efficient quality solutions in the literature. The two algorithms of them constructed byincorporationof the particle swarm optimization algorithm (PSO) and parallel simulated annealing (PSA) methods under different random generation policies. The third one enriched based on genetic algorithm (GA) with PSA. To evaluate the performance of the proposed algorithms, different numerical examples are presented. Computational experiments revealed that the proposed algorithms embedboth desirable accuracy and CPU time. Among them, the PSO-PSAП outperforms than other algorithms in terms of makespan and CPU time especially for large size problems.
Language:
English
Published:
Journal of Optimization in Industrial Engineering, Volume:12 Issue: 26, Summer and Autumn 2019
Pages:
131 to 147
magiran.com/p1980770  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!