A MATHEMATICAL MODEL FOR SIMULTANEOUS PLANNING OF INSPECTIONS AND PREVENTIVE MAINTENANCE IN THE PRESENCE OF MARKOVIAN DETERIORATING MACHINE

Message:
Article Type:
Research Note (دارای رتبه معتبر)
Abstract:

In many industries, some of production capacity will be out of reach when a machine deteriorates. Preventive Maintenance (PM) will enhance the machine condition, but it occupies some of production capacity. The PM will reduce the production capacity and will cause the customer's order delay if it is unnecessary, in contrast the probability of unexpected failure will be increased and will have the same or worst consequences if the PM is too late. One of the ways to deal with this problem is Condition-Based Maintenance with Discrete Monitoring (CBMWDM) whose main challenge is to find an optimal inspection scheme. If the time interval between inspections is too short, the inspection cost will be increased although it will diminish unnecessary PMs and unexpected failures. On the other hand, if the interval between inspections is too long, the sum of unexpected failure and backorder costs will be increased although the cost of inspection will be reduced. Hence, simultaneous planning of the inspections and PM actions should be emphasized. In this paper, a single product single machine system with Markovian deteriorating conditions and demand uncertainty is considered. The main objective is to integrate the inspections and maintenance planning in a tactical level and finite horizon that minimizes the average cost of inspections, maintenances, and backorders. For this purpose, a stochastic dynamic programming model is presented whose structure is dependent to appointed inspection scheme. The state variable of the model is an ordered pair whose components represent the demand and machine condition. The demand is a discrete random variable with arbitrary distribution and the machine condition will be determined after each inspection. Corresponding to each inspection scheme and for each outcome of the state variable, optimal PM decision is obtained and consequently the optimal inspection scheme is determined. The optimal inspection scheme and corresponding PM decisions determine simultaneous inspections and preventive maintenance planning. The strategy of the new model is analyzed for a six-month horizon. Numerical results of the model show that the total average cost is non-decreasing in machine state and demand. Secondly, at the time of inspection, the preventive maintenance should be executed at the same time or earlier if machine state is worse or demand is more.

Language:
Persian
Published:
Industrial Engineering & Management Sharif, Volume:35 Issue: 2, 2020
Pages:
151 to 163
magiran.com/p2126649  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!