Investigation of the Big Karun Basin Features Considering Operation of the Study Construction Development Projects Based on Dynamic System Approach

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

In this study, the impact of operation of the study/construction inter-basin water transfer and agricultural development projects in Big Karun Basin has been investigated. In this regard, the Big Karun Basin including six under operating dams, five under operating inter-basin water transfer projects, 12 drinking and industrial consumers, seven fish farmers, 34 agricultural consumers has been simulated using a dynamic system approach. In addition to quantitative investigation, water quality has been also modeled. Then the behavior of the system was investigated under operation condition of seven under study/construction inter-basin water transfer and nine agricultural development projects. In both conditions, the capability of Big Karun Basin in terms of power generation and water supply for downstream demand was assessed in a different sector based on reliability, resiliency, and vulnerability performance indices. The results indicate 28% reduction in firm hydropower energy generated by the Big Karun Basin system in the condition of operating under study/construction inter-basin water transfer project compared to the present condition. This is very important due to the key role of the Big Karun Basin in hydropower generation throughout the country, especially during the peak consumption hours. Also, the results indicate that the amount of reliability, resiliency, and vulnerability in south Karun will be 70.9, 60.67, and 36.33 for present condition and 51.3, 49.4, and 72.66 for operating under study/construction inter-basin water transfer and agricultural development projects. Quantitative and qualitative zoning figures at each consumer site show although the impact of operating under study/construction inter-basin water transfer and agricultural development projects in northern Karun and Dez rivers is less than the one in southern Karun River basin, however, ignoring integrated water management and continuing system operation process based on the present condition results not only reduction in hydropower generation, but also the inability of Big Karun Basin in terms of quantitative and qualitative supplying of consumers demands in southern Karun Basin and especially in the end parts.

Language:
Persian
Published:
Iranian Journal of Soil and Water Research, Volume:51 Issue: 2, 2020
Pages:
489 to 501
magiran.com/p2139366  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!