SHORTFALLS OF GENERAL CONDITIONS OF CONSTRUCTION CONTRACT AT UNIVERSITIES AND RESEARCH INSTITUTES PROJECTS OF IRAN

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

Universities and research institutes typically consider short-term and long-term construction projects according to their strategic plan to expand their education and research programs. Iranian general conditions of construction contracts should be attached to such construction projects' contracts. Conflict of interests among contracting parties may arise in projects which may put success of the project on risk. The contractor may act on its own interest instead of the owner interest. General conditions of construction contracts are central in mitigating such conflicts and in improving the success of the project. However, there may exist some shortfalls in general conditions of construction contracts. This research explores and addresses shortfalls in general conditions of construction contracts of Iran focusing on construction projects conducted at universities and research institutes. Two hypotheses are proposed to evaluate the importance of revising different chapters of the general conditions of contracts and to consider their possible shortfalls. A survey is made by the use of a questionnaire.Construction practitioners from seventy universities and research institutes are involved in the research. The practitioners are senior personnel coming from owners, consultants and contractors organizations. One way analysis of variance, non-parametric Kruskal Wallis and the least significant difference methods are adopted to analyze the survey data in SPSS. The results in most cases indicate no meaningful difference based on the importance of need for revising different chapters of general conditions of construction contracts. The results also in majority of cases show no meaningful difference among owners, consultants and contractors perceptions about the importance of need for revising different chapters of such general conditions of contracts. It can be concluded that the revision's committee should put the same priority in revising different chapters of general conditions of construction contracts. Based on the perception of the research participants recommendations for improvement of general conditions of construction contracts are provided. This research would be relevant to those interested in revising the general conditions of construction contracts by providing insights for further improvement.

Language:
Persian
Published:
Sharif Journal Civil Engineering, Volume:36 Issue: 2, 2020
Pages:
61 to 73
magiran.com/p2157245  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!