Modelling and simulation of high pressure fogging air intake cooling unit of Omotosho phase II gas turbine power plant
Message:
Abstract:
The aim of this study was to analyze the performance of Omotosho Phase II gas turbine power plant for improved performance. To obtain the required output performance of the gas turbine power plant, operation data from years of 2013 to 2016 was collected from Omotosho Phase II gas turbine power plant in Ondo State, Nigeria. ASPEN HYSYS 2016 version was used to create two models, with one representing Omotosho Phase II gas turbine power plant with fogging unit incorporated while the other represented the power plant without fogging unit. The data was fed as input variables into the models in ASPEN HYSYS 2016 version which simulated the power plant process Specific Fuel Consumption (SFC) obtained from the power plant simulation when fogging is not incorporated was 0.199 kg/kwh, whereas, SFC of the plant with fogging was 0.179 kg/kwh. Thermal efficiency of 43.93% was obtained from the result of the simulated power plant with fogging system, whereas, thermal efficiency of 39.39% obtained from the result of the simulated power plant without fogging system. Net power of 131 MW was obtained from the simulation of the power plant with fogging system while net power of 117.46 MW was obtained when the plant operates without fogging system installed. For the compressor work, 82 MW/h was obtained from the simulation of the power plant with fogging system, whereas, 112.11 MW/h was obtained from the simulation of the power plant without fogging system. Furthermore, turbine work of 213 MW/h were obtained from the simulation of the power plant operating with fogging system while turbine work of 229.57 MW/h was obtained from the power plant without fogging system. This indicates that the incorporation of fogging system into Omotosho Phase II gas turbine power plant is economically viable in terms of fuel consumption, efficiency, power requirement, and GHG emissions compared to operation of the power plant without fogging system.
Article Type:
Research/Original Article
Language:
English
Published:
Journal of Applied Research on Industrial Engineering, Volume:7 Issue: 2, 2020
Pages:
121 - 136
magiran.com/p2169877  
برخی از خدمات از جمله دانلود متن مقالات تنها به مشترکان مگیران ارایه می‌گردد. شما می‌توانید به یکی از روش‌های زیر مشترک شوید:
اشتراک شخصی
در سایت عضو شوید و هزینه اشتراک یک‌ساله سایت به مبلغ 400,000ريال را پرداخت کنید. همزمان با برقراری دوره اشتراک بسته دانلود 100 مطلب نیز برای شما فعال خواهد شد!
پرداخت با کارتهای اعتباری بین المللی از طریق PayPal امکانپذیر است.
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی همه کاربران به متن مطالب خریداری نمایند!
توجه!
  • دسترسی به متن مقالات این پایگاه در قالب ارایه خدمات کتابخانه دیجیتال و با دریافت حق عضویت صورت می‌گیرد و مگیران بهایی برای هر مقاله تعیین نکرده و وجهی بابت آن دریافت نمی‌کند.
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.