Application of FMEA and AHP in Elevated Highway Construction Project Risk Assessment

Message:
Article Type:
Research/Original Article (بدون رتبه معتبر)
Abstract:
Introduction

With accident investigation in industries can be concluded that a significant proportion of work-related accidents occurred in construction industry. In every year, 60.000 fatal accidents occur worldwide in construction sector and one worker dies because of an occupational accident in every 10 minutes. Safety risk identification and risk assessment in the industry is the essential element of risk management program. Except of financial loss, other aspect of political, socio-economic and cultural prospective of accidents must be considered for companies.

Methods

In this study, methodological shortcoming of traditional failure mode and effects analysis (FMEA) method and need to prioritize control measures, has been modified by analytical hierarchy of process (AHP). The FMEA used to risk identification and risk assessment in the elevated highway construction project, then using AHP accidents prioritized according to their physical, psychological, economic and socio-political burden.

Results

In analytical hierarchy of process structure several sub-criteria for each criterion considered and weighted for each item. The five activities included crane collapse, crane collapsed, falling from height, collapse and electrocution devices that their risk priority number is more than 250 are weighted by analytical hierarchy of process.

Discussion

based on literature the traditional FMEA has lots of shortcoming that it is needed to correct with other methods. This the findings of this study showed that in urban projects hazards threatening workers, citizens and company properties. Beside accidents death and injuries, they have negative consequences such as health, psychological, economical Socio – political impact. Accidents cause loss of human life; worker psychological problems, loss of worker`s productivity, damages to equipment or property and furthermore influence the organization`s reputation and profit. The conventional risk priority number (RPN) in FMEA method has been criticized to have many deficiencies and various risk priority models have been proposed to enhance the performance of FMEA in risk analysis. 
 

Conclusion

The risk management in construction in urban area greatly will identify the project hazards and its negative consequents. In this study, a AHP method based FMEA developed to identify and prioritize safety risk assessment in elevated expressway construction showed that the accidents In addition to the risks to life, they have political, social and cultural consequences.

Language:
English
Published:
Archives Of Occupational Health, Volume:5 Issue: 2, Apr 2021
Pages:
988 to 992
magiran.com/p2272982  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!