Knowledge management in a project - oriented organization and its impact on reducing delays of Road Construction Projects in Southern Khorasan

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

Given the increasing importance of time, cost, and resource management, organizations are pushing for a knowledge base consisting of all the knowledge acquired during a project, and with the prior knowledge being put in place to maximize productivity. The purpose of this research is to investigate the effect of knowledge management on the delays of road construction projects in project-oriented organizations. The present study, after explaining the concept of knowledge management and identifying the causes of delays in road construction projects, examines the components of knowledge management and the impact of each of them on reducing the time latency of road construction projects through a questionnaire study method. Then, one of the sub-criteria of delay factors and its effectiveness from knowledge management was investigated. For this purpose, a statistical population consisting of active employers, consultants and contractors in the road construction sector of Southern Khorasan province was considered and parametric tests were used for inferential analysis. Findings show that there is a significant positive two-way relationship between knowledge management and reducing project time latency. This means that the more knowledge management is used in road construction projects, the greater reduction in project latency we will see. Among the components of knowledge management, knowledge creation has the greatest effect (17.42%) on reducing delays and based on the calculated results, it can be said that about 96.8% of delays in projects can be controlled by knowledge management. Also, according to the descriptive statistics obtained in the general case, it can be said that the most important factor affecting the delays are the contractors at the rate of 21.35% and then the employers at the rate of 20.76%.

Language:
Persian
Published:
Journal of Structural and Construction Engineering, Volume:9 Issue: 2, 2022
Pages:
25 to 43
magiran.com/p2449313  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!