New Method to Determine Buffer Size for High Risk Project Environment in Critical Chain Method
Abstract:
In this research, a method for determining feeding buffer sizes in critical chain project scheduling is introduced. The method integrates project characteristics into the formulation as well as environment project risk. Resource tightness, environment risk and network morphology incorporate into the formulation. The method is tested and compared to three commonly suggested methods in the literature, the cut and paste method, the root square error method and adaptive procedure with resource tightness. The comparison is done by means of a simulation study using the kolicsh hartman data set. The test results indicate that all of the suggested methods generate better buffer sizes; therefore, they provide sufficient protection against the delays in project completion time.
Language:
Persian
Published:
Journal of Advances in Industrial Engineering, Volume:43 Issue: 1, 2009
Page:
83
magiran.com/p754587
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
دسترسی سراسری کاربران دانشگاه پیام نور!
اعضای هیئت علمی و دانشجویان دانشگاه پیام نور در سراسر کشور، در صورت ثبت نام با ایمیل دانشگاهی، تا پایان فروردین ماه 1403 به مقالات سایت دسترسی خواهند داشت!
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!