Comparison of Project Delivery Methods in Iran(Owner Attitude)

Author(s):
Abstract:
Projects in oil and power plant industries as well as other infrastructure projects are highly affected by technological developments. Therefore implementation of modern methods and new management technique is inevitable. Recent improvements have enabled the project managers dispense with often unefficient traditional methods and to fulfill the projects with higher quality within pre-assumed duration and budget.
In Iran, investment in oil, gas and petrochemical industries is growing exponentially. Therefore, to achieve the economical and social development, it is vital to improve the methods of managing theses projects.
This paper compares different methods of constructional contracts in Iran with each other. Comparison of the methods has been assessed on different owner's viewpoints using AHP model.
Language:
Persian
Published:
Journal of Civil Engineering, Volume:41 Issue: 1, 2009
Pages:
75 to 82
magiran.com/p1529935  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!