به جمع مشترکان مگیران بپیوندید!

تنها با پرداخت 70 هزارتومان حق اشتراک سالانه به متن مقالات دسترسی داشته باشید و 100 مقاله را بدون هزینه دیگری دریافت کنید.

برای پرداخت حق اشتراک اگر عضو هستید وارد شوید در غیر این صورت حساب کاربری جدید ایجاد کنید

عضویت
فهرست مطالب نویسنده:

iman hassanzadeh nodeh

  • Iman Hassanzadeh Nodeh, Seyed Hessameddin Zegordi *, Isa Nakhai Kamalabadi, Ali Hosseinzadeh Kashan
    Background and Objectives

    The pharmaceutical supply chain should provide medicines in the right quantity, with the acceptable quality, to the right place and customers, at the right time and with optimum cost. Pharmaceutical companies, the most important player in the pharmaceutical supply chain, have a crucial role. An integrated approach in production planning and scheduling in pharmaceutical companies typically optimizes several consecutive stages in the pharmaceutical supply chain because these companies, are both linked to suppliers and distributors/end users. Hospitals are the most crucial end-user among the end-users because of the necessity of a massive amount of drugs to render service to a large number of patients in hospitals. Intravenous fluids and irrigation solutions help patients maintain the optimal internal temperature and increase comfort in hospitals during procedures like surgery or recovery. In this work, simultaneous production planning and scheduling in a real-world application, a production line of intravenous fluids and irrigation solutions at Darou Pakhsh Pharmaceutical Manufacturing Company is addressed.

    Methods

    A novel mixed-integer linear programming model is formulated for multi-period simultaneous production planning and scheduling. Since the problem is NP-hard in the strong sense, a memetic algorithm is proposed that reduces the computational effort of the problem. The chromosome representation is based on a permutation matrix, and a new algorithm is developed to construct a complete schedule from the permutation matrix through the planning horizon.

    Results

    40 problems were investigated, containing 36 randomly generated instances and four real problems according to the data within the last two years. The generated instances were divided into small-sized, medium-sized, and large-sized instances. Among the 36 instances, 22 instances were optimally solved by both the exact method and the proposed memetic algorithm. The average gap for small-sized, medium-sized, and large-sized instances are respectively 0.00%, -1.15%, and -51.38%, indicating as the size of instances grows, the gap becomes considerable. The exact method could not reach an optimal solution for four real instances. The running time for real instances is expanded to 8 hours. The results revealed that the proposed memetic algorithm significantly outperformed the exact method in obtaining better solutions for real instances.

    Conclusions

    The computational results showed that the proposed memetic algorithm obtained optimal solutions on all the instances solved optimally by the exact method. It outperformed the exact method in other problems. This outperformance becomes more evident as the size of instances grows.

    Keywords: Simultaneous production planning, scheduling, production line of I.V. fluids, irrigation solutions, mixed integer linear programming, Memetic algorithm, Darou Pakhsh Pharmaceutical Manufacturing Company
  • Iman Hassanzadeh Nodeh, Seyed Hessameddin Zegordi *
    Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem, it is assumed that each time period includes a number of discontinuous intervals called work shifts. A novel mixed integer linear programming model is formulated. Since this problem is NP-hard in the strong sense, a new heuristic algorithm is developed to construct a complete schedule from a solution matrix that is embedded in the proposed Tabu search. A number of test problems have been solved to compare the performance of the proposed method with the exact method. The results show that the proposed tabu search is an effective and efficient method for simultaneous production planning and scheduling in hybrid flow shop systems.
    Keywords: Simultaneous production planning, scheduling, hybrid flow shop, mixed integer linear programming, Tabu search, work shifts
بدانید!
  • در این صفحه نام مورد نظر در اسامی نویسندگان مقالات جستجو می‌شود. ممکن است نتایج شامل مطالب نویسندگان هم نام و حتی در رشته‌های مختلف باشد.
  • همه مقالات ترجمه فارسی یا انگلیسی ندارند پس ممکن است مقالاتی باشند که نام نویسنده مورد نظر شما به صورت معادل فارسی یا انگلیسی آن درج شده باشد. در صفحه جستجوی پیشرفته می‌توانید همزمان نام فارسی و انگلیسی نویسنده را درج نمایید.
  • در صورتی که می‌خواهید جستجو را با شرایط متفاوت تکرار کنید به صفحه جستجوی پیشرفته مطالب نشریات مراجعه کنید.
درخواست پشتیبانی - گزارش اشکال