فهرست مطالب mohammad doost mohamadi
-
Journal of Optimization in Industrial Engineering, Volume:7 Issue: 14, Winter and Spring 2014, PP 1 -12In this paper we present the problem of designing a three level hub center network. In our network, the top level consists of a complete network where a direct link is between all central hubs. The second and third levels consist of star networks that connect the hubs to central hubs and the demand nodes to hubs and thus to central hubs, respectively. We model this problem in an incomplete network environment. In this case, the top level is an incomplete network where the direct link between all central hubs is not necessary and may lead to lower transportation costs. We propose mixed integer programming model for these problems and conduct a computational study for these two developed models by using the CAB data.Keywords: Hub Location, Hub Center, Hierarchical, Complete, Incomplete Network}
بدانید!
- در این صفحه نام مورد نظر در اسامی نویسندگان مقالات جستجو میشود. ممکن است نتایج شامل مطالب نویسندگان هم نام و حتی در رشتههای مختلف باشد.
- همه مقالات ترجمه فارسی یا انگلیسی ندارند پس ممکن است مقالاتی باشند که نام نویسنده مورد نظر شما به صورت معادل فارسی یا انگلیسی آن درج شده باشد. در صفحه جستجوی پیشرفته میتوانید همزمان نام فارسی و انگلیسی نویسنده را درج نمایید.
- در صورتی که میخواهید جستجو را با شرایط متفاوت تکرار کنید به صفحه جستجوی پیشرفته مطالب نشریات مراجعه کنید.