به جمع مشترکان مگیران بپیوندید!

تنها با پرداخت 70 هزارتومان حق اشتراک سالانه به متن مقالات دسترسی داشته باشید و 100 مقاله را بدون هزینه دیگری دریافت کنید.

برای پرداخت حق اشتراک اگر عضو هستید وارد شوید در غیر این صورت حساب کاربری جدید ایجاد کنید

عضویت
جستجوی مقالات مرتبط با کلیدواژه

res-based method

در نشریات گروه مهندسی معدن
تکرار جستجوی کلیدواژه res-based method در نشریات گروه فنی و مهندسی
تکرار جستجوی کلیدواژه res-based method در مقالات مجلات علمی
  • Hadi Fattahi *, Hossein Ghaedi
    The mining process involves several sequential stages, including drilling, blasting, loading, transportation, and mineral processing. Among these stages, blasting costs (BC) exhibit greater sensitivity compared to others. Inadequate blasting practices can lead to additional drilling, increased explosive consumption, and environmental consequences such as ground vibrations. The variability in blasting patterns and ore rock hardness results in variations in BC. Consequently, there's a need for a method that can establish a relationship between design, geotechnical parameters, and blasting costs while accounting for uncertainties in input parameters. In this study, the rock engineering system method (RES) was employed to construct a complex and non-linear model for predicting blasting costs, considering uncertainties in geotechnical parameters. Data from six limestone mines in Iran were utilized, incorporating 146 data points. The input parameters used for creating this relationship included hole diameter, burden, Emulsion, hole number, hole length, spacing, stemming, sub-drilling, rock hardness, ANFO, number of electric detonators, unia xial compressive strength, and specific gravity. The model was built using 80% of the data (117 data points) to establish the RES-based method, with the remaining 20% (29 data points) dedicated to evaluating and validating the model. To assess its performance, the RES-based method was compared to other statistical regression techniques, utilizing statistical indicators such as root mean square error (RMSE), mean square error (MSE), and coefficient of determination (R2). The results demonstrated that the RES-based method significantly outperformed other statistical approaches, with impressive accuracy, as indicated by MSE=0.00608, RMSE=0.078, and R2=0.9518 in predicting explosion costs. Therefore, the model developed through this method can be effectively applied in mining and rock mechanics projects, providing a high level of accuracy.
    Keywords: Blasting Costs, RES-Based Method, Mining Economy, Limestone Mines, Predicting Blasting Costs
نکته
  • نتایج بر اساس تاریخ انتشار مرتب شده‌اند.
  • کلیدواژه مورد نظر شما تنها در فیلد کلیدواژگان مقالات جستجو شده‌است. به منظور حذف نتایج غیر مرتبط، جستجو تنها در مقالات مجلاتی انجام شده که با مجله ماخذ هم موضوع هستند.
  • در صورتی که می‌خواهید جستجو را در همه موضوعات و با شرایط دیگر تکرار کنید به صفحه جستجوی پیشرفته مجلات مراجعه کنید.
درخواست پشتیبانی - گزارش اشکال