Amine Gas Sweetening System Problems Arising from Amine Replacement and Solutions to Improve System Performance

Message:
Abstract:
This paper includes the significant on-site experience of the authors related to problems faced in amine systems with fresh amine and their possible solutions in phases#2&3 of South Pars gas complex. The amine system was designed as a closed circuit system with the primary objective of removing H2S, CO2, and other acidic components from gaseous hydrocarbon streams. Amine plant operational problems such as excessive foaming, intense corrosion and capacity reduction are observed in gas sweetening unit. Heat stable salt (HSS) accumulations were found to be one of the main reasons for corrosions. Since there are no MDEA purification facilities in phase#2&3, it was decided to replace old MDEA solution with fresh MDEA. However, there are some problems that many plants have experienced after amine replacing or construction. In this paper, practical strategies with experimental data were proposed to overcome these problems.
Language:
English
Published:
Journal of Petroleum Science and Technology, Volume:1 Issue: 1, Spring 2011
Pages:
24 to 30
magiran.com/p1128442  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!