Assessment of Segmental Lining Installation Quality in TBM Excavation, Case Study: Tehran-Karaj Water Conveyance Tunnel (lot II)
Author(s):
Abstract:
Excavation and segment installation is simultaneous in D.S TBM tunneling. Segment quality control in factory and accurate and rapidity in segment installation are premier use segmental lining in mechanized tunneling. But defects in segment factory and stepping and spalling after installation decrease concrete lining quality. Recognition of cause and mechanism of segment defects can be importance in improve Precast Concrete lining. In this paper lining installation quality and causes of concrete damages have been studied using Tehran – Karaj water conveyance tunnel (lot II) site data.
Keywords:
Concrete Lining , Segment , Spalling , Stepping , Karaj Tunnel , TBM
Language:
Persian
Published:
Tunneling&Underground Space Engineering, Volume:3 Issue: 1, 2015
Pages:
37 to 50
magiran.com/p1355108
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!