Development of a Procedure for Re-engineering of the Central Wing Component of a Commercial Aircraft

Message:
Abstract:
In this research, an investigation has been made to find out the reasons of failure occurred in the wing box connection of a commercial aircraft. The investigation consists of mechanical, metallurgical and fractographical tests. A procedure based on MIL-1530-C standard has then been developed for the purpose of re-engineering of the failed component to achieve a design with a higher performance. The results of this research emphasis that to get rid of the deficiencies in aeronautical structural components, an appropriate re-engineering procedure must be derived based on the original used design philosophy in conjunction with appropriate numerical and experimental tests. It is concluded that practical use of this standard can be a complicated task and therefore a refined methodology has to be derived instead based on the considered standard rules and judgments.
Language:
Persian
Published:
Journal of Aeronautical Engineering, Volume:18 Issue: 2, 2017
Page:
40
magiran.com/p1745878  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!