Environmental Risk Assessment of Gotvand-Olia Dam at Operational Phase Using the Integrated Method of Environmental Failure Mode and Effects Analysis (EFMEA) and Preliminary Hazard Analysis

Message:
Abstract:
Introduction
Gotvand-Olia as one of the largest constructional projects in Iran has been constructed on the Karoun River, between Masjed Soleiman and Gotvand Regulatory dam in Khuzestan Province. It is situated in 382.8 km away from the river estuary at a distance of 25 km north of Shoushtar city. This study was conducted to identify and assess the risk of Gotvand-Olia dam on the environment at the operational phase. As a part of the management of water resources, the dam is one of the most important structures playing a major role in the regulation of surface flows, especially in the areas that have poor spatial and temporal distribution of rainfalls. Due to developments in dam construction in the world and particularly in Iran, the need to assess the environmental impacts of dams is very important. Environmental risk assessment is able to establish a relationship between the impacts of unwanted events with those that are not catastrophic. The quantitative risk assessment provides evident objectivity and transparency in the assessment of the impacts.
Material And Methods
The current study aims at assessing the risk of Gotvand-Olia dam at the operational phase. Accordingly, after reviewing the relevant literatures, field studies, and interviewing with expertise and research team, a questionnaire was designed to identify the potential risks during the operational phase. According to the studies conducted in the field of dam risks in the world and particularly in Iran as well as the technical and environmental reports on the Gotvand-Olia dam, the risk factors of the operational period were identified at first using the checklist of the PHA Method and were then assessed by EFMEA. In FMEA, techniques to obtain have degrees of severity, probability, and extent of contamination. After obtaining, the three number can be calculated through the formula Risk Priority Number (RPN)= Severity of risk × Event Risk × Extent of contamination. Subsequently, a list of potential risk factors at the operational phase was included in the questionnaire and placed at disposal of the individuals who were expert on dam and environment. Afterwards, considering the current situation of the study area, overall risk options at the operational phase (21 cases) were classified in the form of physicochemical, biological, socioeconomic, cultural, health-safety, and natural hazards using the PHA checklist. To make a decision on acceptance or rejection of risks, statistical methods were applied to prioritize risk factors and specify their hazardous level due to lack of prioritization of the risks in EFMEA. Accordingly, the high-level risks were identified.
Language:
Persian
Published:
Journal of Environmental Studies, Volume:40 Issue: 1, 2014
Pages:
107 to 120
magiran.com/p1265123  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!