Maintenance scheduling of power units in a restructured power system using MPEC approach

Message:
Abstract:
Yearly maintenance scheduling of power generating units is an important scheduling problem that has to be solved within a restructured power system. Solving period of this problem usually is a one year basis. In this paper, a bi-level approach is used to solve maintenance scheduling problem. The upper level of this bi-level problem represents the profit maximization of power units owned by a generation company (GENCO) while the lower level problem represents the market clearing process. This means that a GENCO wants to maximize its own profit in a market and due to the participation of other producers in it, the market should be cleared and the independent system operator (ISO) establishes the desired security level. The bi-level problem is formulated as a mathematical program with equilibrium constraints (MPEC) using the primal-dual formulation. Various case studies are conducted using the IEEE reliability test system (RTS) and the obtained results are compared.
Language:
English
Published:
Majlesi Journal of Energy Management, Volume:4 Issue: 1, Mar 2015
Page:
41
magiran.com/p1394333  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!