First-Order-Second-Moment Analysis of Reliability in Predicting the Rate of Penetration

Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Summary :To date, given the importance of drilling operations in the mining process and its impact on other phases of extraction, a number of studies have been carried out to investigate the influence of predicted bit rate and to determine the parameters influencing it. The estimation of rate of penetration (ROP) is an integral part of the design and planning stages of a mining project. To achieve a reasonable estimation of the ROP in the rock, it is essential to identify the influential factors, measure the effectiveness, and calculate the uncertainty of each set. The factors examined in current study include thrust, rock mass characteristics including rock mass indices, uniaxial compressive strength of intact rock, Schmidt hardness. Conducting a field study and laboratory testing, a database was compiled from the above parameters in Irankuh mine. Among these parameters, Schmidt hardness has the lowest standard deviation and highest reliability index and thrust has the highest standard deviation and lowest reliability index. This result indicated that in the independent parameters, Schmidt hardness has the lowest and thrust has the highest level of uncertainty. The standard deviation and reliability index of experimental models presented for the (ROP) are also at 53.02 and 0.729 percent respectively. So this relationship to predict the (ROP) in the lead and zinc Irankuh mine is confidence.
Introduction
In this research, the necessary parameters to predict the drilling speed were selected in order to examine the effect of different geological, geo-mechanical and operational parameters of the drilling machine on ROP and prediction of the performance of the drilling machine. The model was obtained from effective parameters for the penetration rate. In the following, the reliability rate of the obtained model was calculated for the rate of permeability of drilling-bit in Irankouh mine to examine the uncertainty rate.
Methodology and Approaches : The first-order second-moment method has the calculations that are relatively simple, and only the information needed to calculate it, is information related to the moments of the input variables, so this method has been used in this research.
Results and
Conclusions
In this research, there is an uncertainty in registered information due to the environment to conduct the field observations and surveys and laboratory tests. Therefore, there is uncertainty and ambiguity in the developed equation to calculate the penetration rate in the Irankouh mine. So it has been tried to calculate the amount of ambiguity and, in fact, the number of variations that indicates the dispersion around the actual value of the penetration rate, using reliability analysis to FOSM first-order-second-moment method.
Language:
Persian
Published:
Journal of Aalytical and Numerical Methods in Mining Engineering, Volume:7 Issue: 14, 2018
Pages:
13 to 21
magiran.com/p1813383  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!