R E P R E S E N T I N G A M U L T I- A T T R I B U T E F U Z Z Y A H P A N D F U Z Z Y D E M A T E L A P P R O A C H I N O R D E R T O R A N K R I S K E F F E C T I V E F A C T O R S I N P O W E R H O U S E P R O J E C T S
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Anxiety for incorrect risks management is the most important obstacle to the development of investment projects. Risk management is the most important part of project management in organizations discussed below, and there is not systematic structural approach to the risk assessment in this study, we use a combination model of Fuzzy Analytic Hierarchy Process (FAHP) and Fuzzy Decision-making Trial and Evaluation Laboratory(FDEMATEL) method to rank and valuate risk factors in Power Plant Projects. Firstly, the risk factors of construction projects are figured out through literature review and expert interview in the second step, the main criteria and sub-criteria are weighted using fuzzy hierarchical analysis is in the third stage, interrelationships among risk factors are calculated by fuzzy DEMATEL. The results of the research identifying causal factors can determine the main risk factors in the powerhouse projects. The populations of the investigation are managers and experts in the field of research. Eleven experts being familiar with construction project management are selected using judgmental sampling. In this study, for the investigation of the distribution of the type of data, Kolmogorov- smirnov test has been used. The prioritization of these factors show that among the main criteria for research, implementation and construction achieved the highest rank, and other factors are important in the next position. Also, among the 53 sub-criteria research, increasing construction costs, the lack of skilled labor, confiscation of property, and land ownership hold the highest priority and are of utmost importance in the standpoint of respondents. The implementation and construction of risk have the first rank., Also, have the highest weight and have the highest interaction with other criteria by DEMATEL in terms of innovation, in most of the topics of risk management this weakness in the present article has been solved.
Keywords:
Language:
Persian
Published:
Industrial Engineering & Management Sharif, Volume:33 Issue: 2, 2018
Pages:
63 to 74
https://www.magiran.com/p1843882
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Compilation and Analysis of Driving Factors for Future Compatible Scenarios of Social Security Services in the Framework of Macroeconomic Variables
Fatemeh Karami, Foad Makvandi, Mohammad Tamimi, , Mojtaba Rajabbaigy*
Jundishapur Journal of Health Sciences, Apr 2025 -
Compilation of Policies for the Targeted Development of Inland Petrochemical Hubs Based on a Futures Studies Approach
Hamzeh Davoodi, Foad Makvandi *, , Ghanbar Amirnezhad, Vahid Chenari
Rahbord Journal, Spring 2024