Abstract:
The effect of twin tunnels excavation on ground settlement and adjacent piles is investigated using numerical analysis and comparison to field monitoring records. Shiraz metro twin tunnels in vicinity of southern ring road bridge are selected as a case study. The result shows the surface settlement is started about three times the tunnel diameter in front of tunnel excavation head and it reaches to a steady state, gently. Vertical displacement of piles is constant due to its stiffness and they can control the ground settlement. Pile axial force and bending moment increases gradually and reaches to maximum amount at tunnel adjacent. The nearest pile has the most force and moment.
Summary : The interaction of twin tunnels and adjacent bridge foundation are modeled numerically using Flac3D software. The ground surface subsidence, adjacent piles axial force and bending moment variation are investigated.
Introduction
Tunneling in weak grounds causes stress and strain variation, which may have a considerable effect on near structures such as pile foundations. The movements of the piles caused by the ground movements and the additional forces and bending moments induced in the piles should be considered by the designers to ensure structural serviceability. In order to analyze the interaction of twin tunnels and near foundation, a pile group has been investigated using the finite difference program FLAC3D. The deformations, loads, and moments induced on existing pile foundations during the tunneling process are discussed.
Methodology and Approaches : In this paper, the tunnel, adjacent piles and surrounding rock mass have been numerically simulated using 3D finite difference method. The results of obtained displacement are compared with real recorded settlement at Shiraz metro twin tunnel project.

Results and
Conclusions
It is necessary to simulate and monitor the building displacement in vicinity of tunneling projects. Suitable location, placement and property of pillars can control the ground settlement. The surface settlement is started about three times the tunnel diameter in front of tunnel excavation head. Axial force and bending moment variation due to various overburden height to tunnel diameter ratio are investigated. The pile axial force and bending moment is increased at lower and higher ratio, respectively.
Language:
Persian
Published:
Tunneling&Underground Space Engineering, Volume:6 Issue: 2, 2018
Pages:
37 to 48
magiran.com/p1849009  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!