Assessment of TBM performance in tunnel excavation (first lot of Karaj - Tehran water conveyance tunnel)

Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Karaj - Tehran water conveyance tunnel (LOT1) was excavated by TBM with 4.66 m diameter whereas the utilization factor is different with tunnel length. According to geological condition, excavated length and personal skill, TBM performance has been compared in four equal parts of tunnel. Evaluation of TBM Activity and delay time shows that in addition of specified factors, the utilization factor also depends on the overlap of activities. In this project utilization factor for every part is 18.30, 22.26, 16.09 and 16.08 respectively.
Language:
Persian
Published:
Journal of Iranian Association of Engineering Geology, Volume:3 Issue: 1, 2010
Pages:
41 to 50
magiran.com/p1868475  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!