Using a New Method to Incorporate the Load Uncertainty into the SEP Problem
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
In this paper, a new method is conducted for incorporating the forecasted load uncertainty into the Substation Expansion Planning (SEP) problem. This method is based on the fuzzy clustering, where the location and value of each forecasted load center is modeled by employing the probability density function according to the percentage of uncertainty. After discretization of these functions, the location and value of each of the new load centers are determined based on the presented fuzzy clustering based algorithm. A Genetic Algorithm (GA) is used to solve the presented optimization problem in which the allocations and capacities of new substations as well as the expansion requirements for the existing ones are determined. With the innovative presented method, the impact of uncertainty of the power and location of the predicted loads on the results of SEP is measured, and finally, it is possible to make a proper decision for the SEP. The significant features of this method can be outlined as its applicability to large-scale networks, robustness to load changes, the comprehensiveness and also, the simplicity of applying this method to various problems. The effectiveness of proposed method is demonstrated by application on a real sub-transmission system.
Keywords:
Language:
English
Published:
Iranian Journal of Electrical and Electronic Engineering, Volume:15 Issue: 3, Sep 2019
Pages:
420 to 433
https://www.magiran.com/p1979404
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Overcurrent Coordination by Eel Swarm Optimization Algorithm
*, Mahsa Salari
Journal of Modeling and Simulation in Electrical and Electronics Engineering, Autumn 2023 -
Coordination of Directional Overcurrent Relay Characteristics Using the PSO Optimization Algorithm
Saeed Saeidi, Hamid Yaghobi *,
Journal of Modeling and Simulation in Electrical and Electronics Engineering, Summer 2023