INTEGRATED PROJECT DELIVERY USING BUILDING INFORMATION MODELING

Message:
Article Type:
Research Note (دارای رتبه معتبر)
Abstract:

There are various weaknesses in the construction industry which should be improved. Improving these weaknesses leads to qualitative and quantitative improvements of the industry. Recently, new technologies and implementation methods have been emerged which lead to increasing productivity, reducing cost, and increasing efficiency for the construction industry. Building Information Modeling (BIM) is one of the most important technologies in this field. Building Information Model is a three dimensional (3D) model which displays physical and functional characteristics of a building digitally. This model is a shared database which can be used to make reliable decisions about the building anytime during its life cycle. Building Information Modeling (BIM), as a powerful tool in the hands of project managers, helps to improve project performance measures; measures like cost, schedule & quality. Despite the benefits of this new technology, due to fragmented nature of conventional contracts, much of its potential remain unused. On the other hand, as a new method in implementation of construction projects, Integrated Project Delivery (IPD), seeks to improve project outcomes through a collaborative approach of aligning the incentives and goals of the project team through shared risk and reward, collaborative decision making, early involvement of all parties, and a multi-party agreement. Integrated Project Delivery (IPD) is a relatively new implementation method in construction industry. Collaboration and good relation among parties is an important factor in the implementation of this delivery system, which highly depends on using BIM technology as a communication tool. Taking maximum advantages of Building Information Modeling becomes possible because of the nature of IPD. In this paper, firstly, Building Information Modeling and Integrated Project Delivery are introduced summarily. After that, the process of using BIM in implementation of IPD will be defined through a flowchart.

Language:
Persian
Published:
Sharif Journal Civil Engineering, Volume:33 Issue: 1, 2017
Pages:
129 to 135
magiran.com/p2007167  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!