Risk Ranking Water Transmission Lines Project Using Fuzzy Decision Process
Author(s):
Article Type:
Research/Original Article (بدون رتبه معتبر)
Abstract:
Risk management is an integral part of a project's success and is a process that helps identify early problems and thus take steps to prevent them from becoming real problems in the future. In this paper, multi-criteria decision making methods are used as a quantitative approach to prioritize identified risks in the project. Finally, after reviewing the problem conditions, a multi-criteria decision-making method for ranking the project risks in fuzzy mode is introduced and the application of this approach in the water transmission line industry by using fuzzy TOPSIS method as a case study of the tropical design project - Part 2 Is located.
Keywords:
Language:
Persian
Published:
Civil and Project Journal, Volume:1 Issue: 4, 2019
Pages:
40 to 52
https://www.magiran.com/p2034780
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Optimized method for calculating weight percent for construction projectsA Case Study of the Tropical Design-Second Part Water Transmission System Project
Ali Ghorbani , Mostafa Pourhosein zakariaee*, Fatemeh Shokati Gourabi
Civil and Project Journal, -
Iranian managers experiences in construction of oil , gas & water transmission lines with emphasis on quality management & cost reductio
Mostafa Pourhosein zakariaee , Saeed Faridnia, Ali Ghorbani
Civil and Project Journal,