Mathematical modeling of activities scheduling with regard to overtime costs and delay penalties: A case study in mining Sector

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Sequencing and timing of project activities with limited resources is one of the important issues related to the field of project management that With proper management can reduce the high costs of projects. One of the projects that could be mentioned, Extraction project of a block of Choghart iron ore mining is located in Yazd province that with accurate identification of its activities, WBS charts and AOA with prerequisite relationships between the activities and resources required are derived. Mathematical model of a particular issue with the aim to minimize overtime costs and delays in project delivery, has been developed. Mathematical model implemented by the GAMS.9 software and results of activities optimization sequencing and scheduling is estimated. The results show that the optimal number 5 sources there is in order to extract a block of Choghart iron ore mine. - - - - - - - - - - - - -
Language:
Persian
Published:
Journal of Modeling in Engineering, Volume:16 Issue: 53, 2018
Pages:
315 to 323
magiran.com/p2040837  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!